[Case Study] Robust System Integration Testing for a Newly Established Data Center
Obtained certification from Uptime Institute! A case study of data center commissioning.
We would like to introduce a case where we provided an advanced comprehensive testing solution that enables digital control and synchronization to colocation service providers based in Asia. The company needed to conduct a Level 5 System Integration Test (IST) as part of the commissioning process to validate the power and cooling infrastructure. Through a digitized load testing solution, we provided detailed test data and reports to corporate clients investigating the resilience of their facilities. This also led to obtaining Tier III certification from the global data center certification body, the Uptime Institute. [Challenges] - There was a need to conduct a Level 5 System Integration Test as part of the commissioning process to validate the power and cooling infrastructure. - There was a possibility that operations within the data center could become congested, leading to a complex and inefficient process. *For more details, please download the PDF or feel free to contact us.*
- Company:Aggreko Japan
- Price:Other